Tower Crane Dismantling Method Statement -

All lifting gear (slings, shackles, chains) must have valid test certificates. 3. Personnel & Responsibilities

If the assist crane has enough height, it simply unbolts and lifts each mast section directly from the top. tower crane dismantling method statement

The assist crane hooks onto the jib at the manufacturer-specified lifting points. Riggers disconnect the jib pins at the tower head. All lifting gear (slings, shackles, chains) must have

A physical barrier at ground level to prevent unauthorized entry into the "drop zone." All lifting gear (slings

The objective is to dismantle the tower crane using a mobile crane or a derrick crane, ensuring the safety of personnel, the structural integrity of the building, and the protection of the public. 2. Pre-Dismantling Requirements Before any work begins, the following must be in place: