Drill holes into the concrete through the base plate holes.Use high-quality expansion anchors or chemical resin anchors.Torque all bolts to the manufacturer’s specified settings. Step 4: Connecting the Top Crossbeam

Electromechanical (dual motors or single motor with chain). Lifting Height: Approximately 1,900 mm to 2,000 mm. Lifting Time: Around 45 to 50 seconds.

Ensure the emergency stop button is not pushed in. Lift Lowers Unevenly

Check for debris blocking one of the carriage rollers. Excessive Noise

If your model has an overhead bridge, install it now.Run the synchronization cables or chains through the crossbeam.Ensure equal tension to prevent the arms from lifting unevenly. Step 5: Electrical Connection

An essential guide for the vehicle lift. This comprehensive manual covers installation, operation, safety, and maintenance. Read on to maximize your workshop efficiency and safety. Table of Contents Overview of the Stenhoj DS2 Technical Specifications Pre-Installation Requirements Step-by-Step Installation Operating Instructions Safety Protocols Routine Maintenance Troubleshooting Common Issues Overview of the Stenhoj DS2

contact
email: [email protected]
contact
other
b2b
links
© 2008-2026 electricwingman Ltd, United Kingdom