Tilt the unit slightly backwards and hook the top of the mounting clip onto the rail. Press the bottom of the unit firmly until it "clicks" into place.
Once the wiring is secure, it is time to energize the system:
Ensure the ventilation slots are not blocked and the ambient temperature is within the rated operating range. 6. Safety Maintenance ssis951mp4 install
This usually indicates an overload. Verify that the total amperage of your connected devices does not exceed the SSIS951MP4’s rated capacity.
Before beginning the installation, ensure you have the necessary tools and environment prepared: Tilt the unit slightly backwards and hook the
Use your multimeter to measure the output voltage.
Check the input fuse and ensure the power source is active. Before beginning the installation, ensure you have the
Locate a clear space on your DIN rail. Ensure there is at least 20mm of clearance above and below the unit for natural convection cooling.
Ensure all power sources are turned OFF before handling wires.
Tilt the unit slightly backwards and hook the top of the mounting clip onto the rail. Press the bottom of the unit firmly until it "clicks" into place.
Once the wiring is secure, it is time to energize the system:
Ensure the ventilation slots are not blocked and the ambient temperature is within the rated operating range. 6. Safety Maintenance
This usually indicates an overload. Verify that the total amperage of your connected devices does not exceed the SSIS951MP4’s rated capacity.
Before beginning the installation, ensure you have the necessary tools and environment prepared:
Use your multimeter to measure the output voltage.
Check the input fuse and ensure the power source is active.
Locate a clear space on your DIN rail. Ensure there is at least 20mm of clearance above and below the unit for natural convection cooling.
Ensure all power sources are turned OFF before handling wires.