Lenel Lnl-3300-m5 Installation Manual Upd Official

is an Intelligent System Controller (ISC) designed specifically for the system. It serves as a plug-compatible, Mercury-based hardware replacement for legacy CASI M5 and M3000 boards , facilitating a modern migration path for systems like Picture Perfect , FCWnx , and Secure Perfect . 1. Pre-Installation Preparation

Before beginning, ensure you have the following requirements and tools: 12 VDC ± 10% at approximately 300mA. Lenel Lnl-3300-m5 Installation Manual UPD

Legacy CASI M Series boards cannot be mixed with Lenel M Series boards in the same controller; if you convert a controller, all boards within it must be upgraded to the Lenel M Series. 2. Physical Installation Steps To install or migrate to the LNL-3300-M5 Physical Installation Steps To install or migrate to

A standard Cat5/6 cable for Ethernet and shielded twisted pair (24 AWG) for RS-485 downstream communication. Pre-Installation Preparation Before beginning

OnGuard software must be licensed and configured for the LNL-3300 series.