Before beginning installation, verify that your hardware matches the following electrical ratings:
L, N: Connect your single-phase 220V AC power supply here.U, V, W: Connect these to your three-phase motor. (Note: Never connect input power to these terminals).(+) , (-): DC bus terminals for external braking units (if required).PE: Grounding terminal. Ensure a solid connection to prevent electromagnetic interference (EMI). Control Circuit Terminals invt che100-0r7g-s2 manual
By following this manual guide, you can ensure a stable and efficient setup for your INVT CHE100-0R7G-S2. For complex automation logic or Modbus communication setups, refer to the full manufacturer PDF for advanced parameter mapping. Control Circuit Terminals By following this manual guide,
The CHE100 utilizes a group-based parameter system. To enter programming mode, press the "PRG" key, use the arrows to find the group, and press "DATA/ENT" to modify. Essential Parameters for Startup To enter programming mode, press the "PRG" key,
S1 to S4: Multi-function digital inputs (forward, reverse, multi-speed).+10V, AI1, GND: External potentiometer or 0–10V analog input for frequency control.485+, 485-: Standard RS485 communication ports for PLC integration.RO1A, RO1C: Relay output for fault signaling or status monitoring. Basic Programming and Parameter Settings
If the drive encounters an error, it will display a fault code on the LED screen.
INVT CHE100-0R7G-S2 Manual: Installation, Wiring, and Troubleshooting Guide