Festo R-r-fto-kc-2018 Manual - Pdf
Ground the valve body properly to conform to EU EMC directives and regional standards. Configuration and Calibration
Ensure that the input pressure stays at least 1 bar above the target pressure. Incorrect parameter profile selected festo r-r-fto-kc-2018 manual pdf
Press and hold the [Edit] key for 3 seconds. Ground the valve body properly to conform to
Before detaching the device, always isolate the electrical power first, exhaust the supply pressure completely, and secure the system against unintended restarts. always isolate the electrical power first
Use the valve strictly in its original condition without unauthorized alterations.
IP65 when correctly installed with its original plug socket ⚙️ Installation and Integration Steps 1. Mechanical Mounting
Optimized for low-noise applications with minimal overshoot.
Ground the valve body properly to conform to EU EMC directives and regional standards. Configuration and Calibration
Ensure that the input pressure stays at least 1 bar above the target pressure. Incorrect parameter profile selected
Press and hold the [Edit] key for 3 seconds.
Before detaching the device, always isolate the electrical power first, exhaust the supply pressure completely, and secure the system against unintended restarts.
Use the valve strictly in its original condition without unauthorized alterations.
IP65 when correctly installed with its original plug socket ⚙️ Installation and Integration Steps 1. Mechanical Mounting
Optimized for low-noise applications with minimal overshoot.